Railway adaptation of the Corato-Andria area
Country
Italy
Location
Bari - Barletta
Customer
Ferrotramviaria SpA
Cost of work
33,9 M€
Purpose of provision
Final and executive design
Project overview
Major project: "Railway upgrading of the north-Barese metropolitan area" (d.g.r. puglia, 12/02/2008, no.146).
Bari - Barletta line: track-doubling, speeding up and upgrading works in the Corato - Barletta section, with burying of the railway track in the built-up area of Andria and interconnection with RFI in the RFI station of Barletta and Bari.
The Bari - Barletta railway line appears to be double-track from Fesca S. Girolamo station to Ruvo station, while, Doubling of the section between Ruvo and Corato is in progress. Thus, the current design calls for track doubling on the single-track segment, which is necessary to achieve double-track continuity on the entire Bari - Andria section.
Services
The activities of Sintagma covered the final and executive design of the work, which includes:
- the doubling of the line from the Corato station (prog. 44+540.33) to the new Andria Sud station (this one excluded from this contract) (prog. 55+370.35) including its electrification;
- The deletion of P.L. km 45+071.90 on the Corato-Andria section of the railway line, with construction of railway underpass;
- The construction of two railway overpasses for the elimination of the L.P. at Km 47+667.47 (Old Barletta Street) and the L.P. at Km 53+186.12 (S. Angelo Vicinal Road), respectively, and the construction of road coplanars for the resolution of other interferences;
- Adaptation of existing artwork (extension of 6 existing masonry bridges, manholes and walls) in the doubling section of the railway track, which is currently single-track.
- the construction of an interchange parking lot for 54 cars in the service yard of the FBN train station, having access from R. Paolucci Street (subject of another contract).