Design of a ski lift serving the Porta Nuova parking lot, Assisi

Mobility and Intermodality

Country

Italy

Location

Assisi, Umbria

Customer

Municipality of Assisi

Purpose of provision

Technical and economic feasibility project

Project overview

The project stems from the dual need to increase the transport capacity of the existing hectometric system, creating a solid alternative for periods of routine and extraordinary maintenance, while at the same time eliminating the architectural barriers created by the presence of escalators alone.

The Porta Nuova parking lot is the main interchange area, on an urban scale, where the cars of numerous tourists converge and, above all, the entire public road transport system (tourist buses, private hire buses, urban and suburban buses).

The need to guarantee high flow rates, both uphill and downhill, and to allow everyone to use the system (the elderly, people with disabilities, children, etc.) led to the decision to supplement the current escalator system with classic vertical elevators.

The project involves a route with two vertical elevators connecting the parking lot with Porta Nuova, one of the main entrances to the city of Assisi. This route has been designed in accordance with regulations for overcoming architectural barriers, resolving all issues relating to accessibility for people with disabilities pursuant to Law 13-1989 and Ministerial Decree 236-1989, and for the blind and visually impaired pursuant to Art. 1.2. paragraph C) of Presidential Decree No. 503 of July 24, 1996, and Art. 2.A paragraph C) of Ministerial Decree No. 236 of June 14, 1989.

The two panoramic elevators on two sides, in addition to the access door on the mountain side, each have a capacity of 2500 kg. This is equivalent to 33 people (comfortably accommodating 26 people). The cabin measures 1800 x 2600 x 2100 and climbs from an altitude of 199.95 to 217.80 meters above sea level. Therefore, each cabin has a safety exit at 10.70 m from the landing level of 217.80 m above sea level.

The landing is connected to the gardens on Via Borgo Aretino by a walkway that is 2.40 m wide and 22.15 m long, with a slope of 2.5% from an elevation of 217.80 to 218.30 meters above sea level.

The walkway will have an intermediate support with a strut with a hinge constraint that discharges onto the reinforced concrete structure of the elevator shaft.

Services

Sintagma activities Sintagma the design of the work, which included:

  • Analysis of alternatives
  • Elevator system design
  • Design of connecting roads and parking lots
  • Mitigation measures