Upgrading of SS16 between the municipalities of Falconara Marittima and Ancona

Highways and Roads

Country

Italy

Location

Falconara-Torrette route

Customer

Anas S.p.A.

Cost of work

183,5 M€

Purpose of provision

Final and executive design

Project overview

The project involves the upgrading of SS16 from 2 to 4 lanes between the "Falconara" interchange and the "Torrette" interchange (including interchanges) for an extension of about 7.2 km that includes the territories of the municipalities of Falconara Marittima and Ancona

Services

Activities at Sintagma covered the final and executive design, which included:

  • Plan for topographic surveys and geognostic investigations;
  • Environmental, geotechnical, hydrological, and hydraulic studies;
  • 7.2 km of new 2-lane dual carriageway road;
  • 4 viaducts with a total length of more than 900 meters;
  • 2 tunnels with a total length of more than 750 meters;
  • 2 Multilevel intersections;
  • Program of organization of works, utilities and expropriation of land;
  • Technical specifications and contract documents.