Upgrading of SS16 between the municipalities of Falconara Marittima and Ancona
Country
Italy
Location
Falconara-Torrette route
Customer
Anas S.p.A.
Cost of work
183,5 M€
Purpose of provision
Final and executive design
Project overview
The project involves the upgrading of SS16 from 2 to 4 lanes between the "Falconara" interchange and the "Torrette" interchange (including interchanges) for an extension of about 7.2 km that includes the territories of the municipalities of Falconara Marittima and Ancona
Services
Activities at Sintagma covered the final and executive design, which included:
- Plan for topographic surveys and geognostic investigations;
- Environmental, geotechnical, hydrological, and hydraulic studies;
- 7.2 km of new 2-lane dual carriageway road;
- 4 viaducts with a total length of more than 900 meters;
- 2 tunnels with a total length of more than 750 meters;
- 2 Multilevel intersections;
- Program of organization of works, utilities and expropriation of land;
- Technical specifications and contract documents.