State road 16 upgrade, Marche region

Highways & Roads

country

Italy

location

Upgrade to 4 lanes Falconara-Torrette section

client

Anas S.p.A.

cost of works

€ 183,5 Millions

scope of works

Final and detailed design

Overview

The project envisages the upgrade of the SS16 from 2 to 4 lanes between the “Falconara” junction and the “Torrette” junction (including junctions) for an extension of about 7,2 km which includes the territories of the municipalities of Falconara Marittima and Ancona.

Services

Sintagma’s activities concerned the Final and Detailed design that included:

  • Topographic surveys and geognostic investigations plan;
  • Environmental, Geotechnical, Hydrological and Hydraulic study;
  • 7,2 Km of new road with dual 2-lane carriageways;
  • 4 viaducts with total length of over 900 meters;
  • 2 tunnels with total length of over 750 meters;
  • 2 multi-level intersections;
  • Works organization program, utilities and land expropriation;
  • Technical specifications and contract documents.